Data Center Lease Opportunity — Southern Georgia

Minder - Phase 1

A hyperscale-sized power campus — built, contracted, and funded.

Minder has operated in Southern Georgia for six years and developed the on-site substation serving the campus—significantly reducing power-delivery risk, utility queue exposure, and substation lead times.

HyperscaleSized Development
PowerIn Hand Today
H1 2027Phase 1 RFS
N+1At Full Build
The Opportunity

A proven operating site, not a speculative build.

Phase 1 sits on a campus Minder has owned and operated for six years. The power, the site control, and the capital are already in place.

01

Six Years Operating

Minder has operated a bitcoin mining site in Southern Georgia for the last six years — established local relationships, utility standing, and site infrastructure.

02

Substation, Built by Minder

Minder developed the on-site substation, sourced from a Georgia power co-op, and downstream data center critical infrastructure (UPS, GEN, switchgear, etc).

03

Expansion Within 18 Months

Minder has signed an ESA addendum adding significant capacity. All capital commitments have been released — the 18-month clock is running.

At full build, the substation serves the entire campus in an N+1 configuration across breakers and transformers.

Minder-developed substation — expansion underway. The rarest ingredient in AI infrastructure, power, is already on site.
Power in Hand
Site Overview

Minder - Phase 1, at a glance.

A fully entitled campus designed for next-generation AI and HPC density, backed by a utility-scale power position.

H1 2027
Phase 1 critical IT — ready for service
Hyperscale
Sized development — power on site today, scaling to full build
N+1
Substation configuration at full build
100G
Fiber connectivity to the campus
↓ PUE
Adiabatic-assist cooling lowers PUE and water use
GB300
GB300 / VR200 and AMD Helios ready, liquid-to-chip
2
Purpose-built buildings on the campus
100%
Fully entitled — supported by the Mayor and local community
Schematic cutaway of a Minder - Phase 1 data center building showing the data hall, chiller room, and adiabatic dry-cooler yard
Schematic view — data hall, chiller room, and adiabatic dry-cooler yard.
Phased Delivery

Growth & expansion, on a funded schedule.

Two-phase critical IT delivery, layered onto a substation expansion that is already underway.

Phase 1

Critical IT Capacity

Ready for Service — H1 2027
Phase 2

Additional Critical IT

Ready for Service — Q1 2028

Substation expansion underway. ESA addendum executed and capital released — full expanded capacity within 18 months, N+1.

Aerial site overview of the Minder campus showing Data Center Buildings 1 and 2, the substation and the property boundary along Industrial Park Road
Site overview — Buildings 1 & 2, 580 Industrial Park Road
Schedule Certainty

Long-lead risk, retired early.

Equipment lead times are the number one driver of RFS risk on any data center build — ours are already moving, ahead of tenant commitment.

  • — Long-lead electrical and mechanical packages advanced on spec
  • — PO releases begin August 2026, sequenced to the critical procurement path

"Equipment lead times are the #1 driver of RFS risk — ours are already moving."

22
OFCI packages across electrical & mechanical scopes
Aug '26
PO releases begin
2027
Need-on-site dates sequenced through
Site Progress

Land cleared and leveled — in under six weeks.

Substation live, buildings underway. The pace on site matches the pace of the commercial commitments behind it.

Wk 1–2Timber cleared and site opened
< 6 WksSite cleared, building pad graded
H1 2027Phase 1 ready for service
Aerial view of the original Minder site, June 2026
Before — June 2026Original site, aerial
Land clearing underway at the Minder - Phase 1 site, early July 2026
Early July 2026Land clearing
Timber cleared at the Minder - Phase 1 site, early July 2026
Early July 2026Land clearing
Land leveling at the Minder - Phase 1 site, late July 2026
Late July 2026Land leveling
Land leveling at the Minder - Phase 1 site, late July 2026
Late July 2026Land leveling
Leveled building pad at the Minder - Phase 1 site, late July 2026
After — Late July 2026Land leveled
Location & Access

An established industrial park, minutes from the coast.

The Site

An established industrial park with existing Minder operations already on site.

Driving Distance

1 hour from international airport

36nonstop destinations served from the nearby international airport

Convenient access for tenant operations, commissioning, and vendor support.

Atlanta Dallas Chicago Denver Houston New York Boston Minneapolis Detroit +27 more
Get In Touch

Built for tenants. De-risked for investors.

AIDC Tenants

Lease critical IT capacity at Minder - Phase 1

Hyperscale-sized critical IT capacity ready for service H1 2027, scaling further at full build. Liquid-to-chip ready for GB300 / VR200 and AMD Helios densities, with 100G connectivity.

Request Site Package
Debt & Equity Investors

Power in hand, delivery de-risked

A 6-year operating site with a Minder-developed substation, released capital, and long-lead equipment already on order. Not a speculative development.

Request Investment Materials
Contact

Let's talk about Minder - Phase 1.

Reach out for a site package, a tour, or investment materials. Our team will follow up within one business day.

Tenant & Leasing Inquiries

Lease@MinderLLC.com

Investor Relations

Invest@MinderLLC.com